For DRC and Planning Applications please email ecourton@oaklandtn.gov. Do not submit online.
Oakland Permitting Information
- First, you will need to fill out an APPLICANT SIGNATURE FORM- PLEASE SIGN AND DATE. YOU WILL NEED TO SAVE THIS TO YOUR COMPUTER. THIS WILL NEED TO BE UPLOADED WITH EVERY PERMIT.
- Second, you will now begin your APPLICATION Submittal. This will include all of the details of the home.
- Third, you will upload the SEWER RECEIPT, AFT FORM AND E2 FORM
- FOURTH, You will upload your DIGITAL PERMIT SET. (PLEASE NOTE- IF THE HOME HAS NEVER BEEN BUILT WE WILL NEED A “PAPER’’ MASTER COPY AS WELL AS THE UPLOADED DIGITAL SET.)
**AS OF MARCH 1, 2025 ALL PLANS MUST SHOW 1 HOUR FIRE RATED WALL IF HOUSE IS LESS THAN 5’ FROM PROPERTY LINE. ALSO, HEAT DETECTOR MUST BE ANNOTATED ON PLANS.( LETTER FROM ELECTRICIAN WILL BE ACCEPTABLE) - Finally, you will upload your APPLICATION SIGNATURE FORM (step 1)
***All required documents MUST be uploaded**